Skip to content
Agcor Steel
Metal Roofing, Pole Barns, Wooden Trusses, Steel Trusses, Contractors
Home
POLE BARNS
METAL ROOFING
WOOD TRUSSES
STEEL TRUSSES
CUSTOMERS
Employment
Portal
GET QUOTE
Home
POLE BARNS
METAL ROOFING
WOOD TRUSSES
STEEL TRUSSES
CUSTOMERS
Employment
Portal
Rollform Line Maintenance Checklist Weekly: 30 Minutes
First Name
Last Name
Date / Time
Checkbox Field
Visually check all toolings clearance with mirror. Make sure gap appears correct across entire station. Check with feeler gauge if a gap appears incorrect.
Visually check tooling and any moving parts for signs of wear.
Run and jog machine empty and listen for any unusual noises and pinpoint cause.
Visually inspect under, in, and around machine for any sign of wear(material accumulation e.g. Paint dust, metal shavings, rubber dust, oil, loose screws, etc.)
Physically check bolts on uncoiler arms.
Check for adequate tension on drive chains (Rollformer & Uncoiler)
Comments/Notes
Submit Form
Rollform Line Maintenance Checklist Monthly: 2 Hours
First Name
Last Name
Date / Time
Monthly
Physically check sprocket set screws-Power down, lock out, remove guard panels, remove motor chain(s), rotate shafts and tighten all loose set screws. Apply BLUE locktite as needed.
Physically check clearance gaps between top and bottom dies and make adjustments as needed.
Visually check sprockets for unusual wear.
Physically check for other loose bolts, nuts, and screws.
Grease Chains.
Comments/Notes
Submit Form
Rollform Line Maintenance Checklist 6 Months: Ag Panel, 1 Hour
First Name
Last Name
Date / Time
6 Months
Grease bearings-Only 1 to 2 pumps of grease to zerks located on each bearing.
Comments/Notes
Submit Form
Rollform Line Maintenance Checklist Yearly: R-Panel, 1 Hour
First Name
Last Name
Date / Time
Yearly
Grease bearings-Only 1 to 2 pumps of grease to zerks located on each bearing.
Comments/Notes
Submit Form